Frontier Consultancy
POWER PLATFORM LANE · HVE-first course. Supplied fictional feedback is not live execution.
Download Markdown sourceAfter a prompt: find output and next actionCopy prompts below. Review every proposed action before running it.

Case 03: what process insight and intervention data are needed?

HVE-DECISIONS-1.0. Fictional interview/design feedback. RULE-03 and process-events.csv define the baseline.

Client interview evidence

Technology-specific decision context

Process Mining needs a case identity and historical activity/timestamp events. A reminder feature needs current pending work and follow-up history; an event log does not automatically supply that state.

Decide whether the first intervention is a reviewer rota, reminder automation or further observation. Define only the event/work/experiment/follow-up data required for that choice.

Proposal to inspect

Change for discussion

Supplied fictional design-review feedback

ID Walkthrough finding
C03-T1 CASE-04 is hidden from the proposed report's population.
C03-T2 Current status cannot reconstruct CASE-02's waiting interval.
C03-T3 The model has one Reminded flag, with no distinction between failure and successful follow-up.
C03-T4 No comparable post-intervention observation is defined.

No executed reminder, mining refresh or achieved process improvement is supplied.